Capital repair of metro escalators with the rises up to 70 meters:

  • Prague metro (Czech Republic), capital repair of escalators after the flood — overall 47 escalators (download the case study.pdf);
  • Helsinki metro (Finland) — stations “Sornainen”, “Rautotientori”, “Hakaniemi North”, “Hakaniemi South” — 13 escalators;
  • Moscow metro- station “Chkalovskaya” — 3 escalators;
  • St.Petersburg metro — stations «Gostinyy dvor», «Nevskyy pr.», «Gorkovskaya», «Pl. Aleksandra Nevskogo», «Proletarskaya b/n», «Proletarskaya m/n» — 18 escalators;
  • Serbian railroad station “Vukov Spomenki” — 3 escalators;
  • Monorail transport system of Moscow- all stations — 33 escalators.

Modernization of metro escalators:

Installation of metro escalators:

  • Installation of 4 escalators ЕТК-215 Н=9,4m station “Oktyabrskaya”, Minsk metro;
  • Supply and installation of 2 escalators ET-5M H=6,2m station “Nasimi”, Baku metro;
  • Installation of 6 escalators KONE H=11m station “Namesti Repubiky” and “Mustek”, Prague metro;
  • Supply of spare parts, repair and installation of 3 escalators ET-3M H=35,4m station “28 May”, Baku metro;
  • Installation of 8 escalators ET-5M (3 escalators station “Miigurit” H=11,4m, 3 escalators station “Radgiabal” H=9,8m, 2 escalators station “Kodrit” H=7,4m), Tashkent metro;
  • Installation of 5 escalators ET-5M H=9,8m station “Azi Aslanova”, Baku metro;
  • Installation of 3 escalators E25T H=12m station “Park Pobedi”, Moscow metro;
  • Installation of 6 escalators E900T H=9,4m station “Skobelevskaya”, “St. Ul.Gorchakova” Butovskoy line of Moscow metro;
  • Installation of 3 escalators E900T H=9,4m station “Ul. Eizenschteina” Moscow monorail transport system;
  • Installation of 3 escalators ET-5M H=9m station “Moscowskaya”, Samara metro.

Expertise of metro escalators:

  • Expertise of metro escalators which have run-out the normative resource with the determination of the remaining life-time — more then 40 escalators of Moscow metro;
  • Expertise of escalators with the determination of possible operation prolongation before capital repair, dates of the next repair, scope of the repair — 12 escalators of Moscow, Dnepropetrovsk and Samara metros.

Installation of commercial-type escalators and elevators:

  • Installation of 32 escalators and 6 elevators in “Stockmann” in the city center of Saint-Petersburg;
  • Installation of 18 escalators on the railroad station “Ladozhskiy vokzal”, Saint-Petersburg;
  • Installation of escalator groups in trade-centers “Atlantic city”, “Dom Mertensa” “Planeta Neptun”, “PIK”, “Pyaterochka”, “Metrika”, “Megalit” and others in Saint-Petersburg;
  • Disassembly of old escalator groups and installation of new escalator groups in the center of Helsinki — trade center “Forum”, trade-center “Aleksi” (18 escalators);
  • Installation of escalator and elevator groups in trade centers “Prisma”, “Itakeskus” and others in Helsinki.

Annual average of escalator installations — 80–100 units.
Annual average of elevator installations — 100–150 units.