Capital repair of metro escalators with the rises up to 70 meters:
- Prague metro (Czech Republic), capital repair of escalators after the flood — overall 47 escalators (download the case study.pdf);
- Helsinki metro (Finland) — stations “Sornainen”, “Rautotientori”, “Hakaniemi North”, “Hakaniemi South” — 13 escalators;
- Moscow metro- station “Chkalovskaya” — 3 escalators;
- St.Petersburg metro — stations «Gostinyy dvor», «Nevskyy pr.», «Gorkovskaya», «Pl. Aleksandra Nevskogo», «Proletarskaya b/n», «Proletarskaya m/n» — 18 escalators;
- Serbian railroad station “Vukov Spomenki” — 3 escalators;
- Monorail transport system of Moscow- all stations — 33 escalators.
Modernization of metro escalators:
- Alteration of operational speed — more then 100 stations of Moscow, Petersburg, Helsinki, Prague, Yekaterinburg and other metros;
- Modernization of operation (main) brake — more then 100 stations of Moscow, Petersburg, Helsinki, Prague, Yekaterinburg and other metros;
- Modernization of electrical drive of escalators with the replacement to control cabinets based on modern contactor-reley systems — more then 100 stations of Moscow metro;
- Modernization of electrical drive of escalators with the replacement to control cabinets based on frequency control system — 3 escalators of station “Tretyakovskaya”, Moscow metro;
- Replacement of old auxiliary brake to the auxiliary brake of new design — normal-closed with constant moment — 36 escalators on 12 stations;
- Installation of safetystrip deflector brushsystem — more then 300 stations of Moscow, Petersburg, Helsinki, Prague and other metros;
- Installation of new escalator monitoring system — more then 300 stations of Moscow, Petersburg, Helsinki, Prague and other metros;
- Installation of improper direction start safety device — more then 300 stations of Moscow;
- Installation of step missing/positioning safety device — more then 300 stations of Moscow;
- Modernization of guides zone A of escalators E25T — more then 50 stations of Moscow;
- Installation of self-positioning landings — more then 300 stations of Moscow;
- Supply and installation of new type of handrail — more then 16 km, metro of Moscow.
Installation of metro escalators:
- Installation of 4 escalators ЕТК-215 Н=9,4m station “Oktyabrskaya”, Minsk metro;
- Supply and installation of 2 escalators ET-5M H=6,2m station “Nasimi”, Baku metro;
- Installation of 6 escalators KONE H=11m station “Namesti Repubiky” and “Mustek”, Prague metro;
- Supply of spare parts, repair and installation of 3 escalators ET-3M H=35,4m station “28 May”, Baku metro;
- Installation of 8 escalators ET-5M (3 escalators station “Miigurit” H=11,4m, 3 escalators station “Radgiabal” H=9,8m, 2 escalators station “Kodrit” H=7,4m), Tashkent metro;
- Installation of 5 escalators ET-5M H=9,8m station “Azi Aslanova”, Baku metro;
- Installation of 3 escalators E25T H=12m station “Park Pobedi”, Moscow metro;
- Installation of 6 escalators E900T H=9,4m station “Skobelevskaya”, “St. Ul.Gorchakova” Butovskoy line of Moscow metro;
- Installation of 3 escalators E900T H=9,4m station “Ul. Eizenschteina” Moscow monorail transport system;
- Installation of 3 escalators ET-5M H=9m station “Moscowskaya”, Samara metro.
Expertise of metro escalators:
- Expertise of metro escalators which have run-out the normative resource with the determination of the remaining life-time — more then 40 escalators of Moscow metro;
- Expertise of escalators with the determination of possible operation prolongation before capital repair, dates of the next repair, scope of the repair — 12 escalators of Moscow, Dnepropetrovsk and Samara metros.
Installation of commercial-type escalators and elevators:
- Installation of 32 escalators and 6 elevators in “Stockmann” in the city center of Saint-Petersburg;
- Installation of 18 escalators on the railroad station “Ladozhskiy vokzal”, Saint-Petersburg;
- Installation of escalator groups in trade-centers “Atlantic city”, “Dom Mertensa” “Planeta Neptun”, “PIK”, “Pyaterochka”, “Metrika”, “Megalit” and others in Saint-Petersburg;
- Disassembly of old escalator groups and installation of new escalator groups in the center of Helsinki — trade center “Forum”, trade-center “Aleksi” (18 escalators);
- Installation of escalator and elevator groups in trade centers “Prisma”, “Itakeskus” and others in Helsinki.
Annual average of escalator installations — 80–100 units.
Annual average of elevator installations — 100–150 units.